Hello everyone.
How to do timing analysis? I have no idea where to start so I'd love to get some useful material recomendations to study about it, or the way you do it.
I currently have a robot tending 3 milling machines and robot goes from the loading station to each machine one at a time. At one point all the machines are full, robot waits a bit and then fills all three machines in a row with no pause in between. My boss asked how would it affect time if I forced a robot to wait for each machine a bit, stagger them in a way that robot splits his bigger wait into 3 smaller ones.
I could make a table in excel and try to set up some timing diagram and try to move stuff manually around to see what would happen in theory, but I'm sure there's a better way, I just don't know it yet.