I am making a production line for wheel assembly's. An irb 6400 with s4c controller will be lifting the wheels in and out of machines. There are different types and sizes of wheels so will require different programs for each one. I am controlling the production line with a PLC with a HMI screen, I'm wondering if when I change the program on the PLC can I also call the relative program on the robot without having to actually go lift the teach pendant and change it manually there.
Thanks