I was wondering if its possible to run the master job but be able to call up a sub master job do do a recovery?
Master and Sub master job call
-
Noob1982 -
March 14, 2019 at 2:30 PM -
Thread is marked as Resolved.
-
-
Or can I have the PLC call the master job from anywhere?
-
Hi Noob1982,
I have the same concerns before.
Then I already solved that because of the advice of Sir Fabian Munoz.See the Link:
https://www.robot-forum.com/robotforum/yas…otominigp8gp12/
The above link is our conversation before. I already tried that and it really works 100%.
-
Ok yeah I was just curious if when the robot was stopped and needed to restart if I could have the plc call the top of sub1 master. Its been a little slow going because all I had to work with was the smart pendant which if anyone is wondering is absolutely useless if your setting up a robot or doing any advanced programming. So its going faster now that I was able to get a standard pendant on loan from Motoman.