Hi, guys,
I am doing welding and want to slow down the process at the end of track to get rid of the slope. So all the parameters (laser energy, wire speed and robot speed) need to be decreased gradually when it comes to the end. How I can do it by calling some subroutine or by calling a interrupt.
Thank you in advance.
Housebear