Hi Everyone,
We are using a Rockwell PLC and PNS method to run programs.
Is it possible to continue with a program using PNS Method after an E-stop Situation?
All UI Signals are exchanged with the PLC and PLC controls the starting sequence. Whenever there is an unplanned stopping situation, the program starts from the top.
We don't use power locks on our cells. Whenever someone opens the door everything stops, this is specified by the customer.
Is there a way to continue the program without starting from the top?
Thanks for your help.