I am unable to activate geolink . I am able to move both robot in respect of tool and base. Able to move slave robot with master in T1 mode. So Please advise or suggest what to do ?
How to programming Master and slave robot with Geo Link
-
rondip2000 -
February 9, 2016 at 5:11 AM -
Thread is marked as Resolved.
-
-
With this much information the best info I can give is: read documentation and there is a GEOlink inline form.
Fubini
-
You have to configure everything in WorkVisual... afterwards, just select the right base (the one that makes the link) on the slave robot and there you go... move the master and all the slaves with the right base selected will follow.
As Fubini says, more information is needed here.