Hello, I was wondering if it was possible to change an existing weld program from weld start to arc start or vice versa when moving programs from one robot to another. I have multiple genesis weld cells that are identical to each other, other than a few are setup to use schedules and most use weld processes. I'm aware of how to change system variables to change the cell over from one to the other but don't want to change the whole cell just the program to make it easier to setup when pulling it from a cell that uses arc start and put them in a cell that uses weld start or vice versa. currently have to manually jog robot to every arc start and arc end line and delete it and then reinsert new instruction because it won't allow you to step forward and go to that point it comes up with an error not allowed because of illegal arc or weld instruction etc. It would be nice if there was a way to shift or change program itself all at once instead of converting every start and end. It's just time consuming when there's 50-100 welds in a program. robots are arcmate 100ic. or 120ic with Lincoln weld equipment