I have a workvisual project (KRC4) that is an 'upload' from a real controller.
On Office Lite the same type of robot is setup, only when I deploy my Workvisual project for transferring it to Office Lite, I get a message that the controller version in Workvisual is 8.3.33 and in Office Lite it is 8.3.18. The only option is to change my Workvisual controller version to 8.3.18.
But I would prefer to upgrade the version in Office Lite to 8.3.33, but I don't know how this is possible?