Hello,
I wondered if and how it is possible to perform two PTP commands at the same time. I want to correct the robots destination while the robot is moving therefor an additional PTP command with some offset (delta) should be performed in parallel.
E.G. I create a robot program and the SPS.sub is starting a control task that does the surveillance of the robots motion and compensates the motion if necessary.
Does anybody have experience with this?