I am trying to remember how to configure robot to overwrite an existing job. I did this in the past. I created a newbie thre
ad here and the notes I left in that thread are the following
Loading a file
If you do a backup and edit a file offline or want to reload a program that you backed up prior that same program cannot be in the controller at the time. If you would like to be able to load a program and overwrite turn RS60 to a 2 this will allow you to be prompted for overwrite permission. Note if there is a syntax other or other reason the loaded fail is not acceptable you will lose the initial program in the controller the process of overwriting blows away what is in the controller
I am using a DX100 controller. I am in management mode 3 keys, I changed the RS60 to a 2, even rebooted and still cannot overwrite the existing job with an offline edit, so I have to delete it prior to loading.
Can anyone help me configure this controller.
Thanks in advance. Dana