Hello to everyone. I have one ABB IRB 6620 Spot Welding robot. Air, water and communication cables go together inside the Dress Pack. I constantly have problems with the communication cables. I want to take the cables from the outside, but it should look beautiful and stylish. Is there a solution you can offer for this?
My dress pack is Murr Plastik;