No I don't check out the complete project folder (it was only an example for the screenshoot ), we check-out in the working folder only the cell we need and the same the cell with hierarchy.
has you can see in the screenshoot here I check-out only what I need and where I work. The red x are other cell checked out from other colleagues.
No, I don't get any error message when I check in.
Posts by Robosoika
-
-
Does anybody use the Check in / Check out green flag to set as a working project in a server?
Our problem is.....We are a big Italian company and we work with project that are save in a server (eMServer)When somebody will load the project still use a green flag call "check-out" and when have finish to work put the same project in check-in so nobody (normally) can load or work/rewrite in the same project and overwrite our work.
Few days ago have start our problem. I was working for the completely day and when I have reload the cell the day after my job was away. Did anybody use the same modality to fix a project in a state as we make?
-
Hello Guys
I'm programming the Safe Operation procedure due the robot need safe configuration because work in a safety area where forklift load and unload pallet.
In the middle of the configuration I was at the point to teach the reference position for group with the tool (fork) in the sensor. After I teach the point and safe the configuration I bring the error in attached. The translation from German languages say that no tool is configurate in the safe configuration (error line 3180) but the flag in the tool configuration is active. After the restart I can't move anymore the robot till the safe operation flag is activ. Does anybody have a solution?