Hi,
I have a Kuka robot with KRC5 controller and KSS8.7.
My application doesn't have a PLC and use the robot controller control everything. The mastering test is requested every time after the controller is rebooted. Is there a system variable or something like that could let your program know the controller is rebooted just now, and then call the mastering test program first?
Thanks