I need assistance with a yrc-1000 micro running a SG-400 I need to run a subroutine to cycle parts for pick using photo eyes and air valves. I can write it into my job but it slows down the program till parts are ready for pick Is there a way to run the parts cycle concurrently with my pick and place job?
YRC1000 Micro
- airborne1319
- Thread is Unresolved
-
-
If you have the concurrent job software option, non motion instructions could be written into a non-group job. The non-group job could then be PSTARTed out of another job and run concurrently.