Hey,
I want a motion in kUKA KRC4 from point A to point B to be time controlled rather than speed controlled. I want that the linear motion must be completed in the mentioned time period rather than mentioning the velocity of the motion. I have heard of such a concept in ABB robot, curious whether KUKA also gives any such feature or not.
Thanks!!