Hi everyone,
I have KUKA KRC4-8.6.4 Robot and Siemens S7-1200 PLC. My WorkVisual version is V6.0.16.
I am doing pick and place motion in 5 station.
My motion sorting is :
1- PTP BefPickPress C_DIS
2- LIN PickPress C_DIS
3- LIN AftPickPress C_DIS
4-LIN AwayPickPress C_DIS
5- LIN BefPickPress C_DIS
All C_DIS Parameter is 100. I have a problem about blending PTP to LIN Motion.
When the robot is running 1.step PTP BefPickPress C_DIS, the robot move what I want. After then, When the robot is running 2.step LIN PickPress C_DIS, the robot immediately slower than PTP BefPickPress C_DIS. This slower motion can see clearly.
How can I solve this problem ?
I am waiting for reply, thank you.