Hi,
In ABB visual safe move pro.
We are using a software syncronisation.
When we power off the cell and turn on the power.
The software syncronisation is lost in safe move pro and once again we have to do software sync manually.
How to fix it?Even after poser off and on. The software sync in safe move pro must be retained.
Thanks in advance.