HI
Let' say you have 10 robots that are going to be doing the same operation. They have the same configuration
So, I do one of them, with line tracking, vision, etc, etc..
I like to copy all this info to the rest of them ( it will required touch up, obviously)
Normally what I do is load the TP, progrs, the IO, etc, etc but takes some time
I would love to do and image backup from robot 1 and just dump it on the other one. The problem doing that is that I'm going to destroy system information the belongs to the other robot.
What is the problem if I follow the next procedure
On robot 1 do an image backup (Robot 1 is at zero position)
Jog Robot 1 is at zero position
On robot 2 do All of the above
Do an image restore on robot 2 from robot 1. This is where you destroy Robot 2
Load on robot 2 SUMMARY which will rebuild robot 2.
Can I do this, do I have to load any other file. ?