I had a job where the robot would get very close to a conveyor when trying to pack a part so I tied a cube to the Speed Limit input. Anytime the robot enters the cube the robot goes into the Speed Limit mode.
You can define maximum 4 system job and this jobs are always running with usaully jobs and you can calculate every thing and use its data in robot job.