How to Synchronize SC1?
After going through the steps it fails synchronization.
ABB-6640 SC 1 Not Synchronized
-
srtautomation -
September 1, 2018 at 12:02 AM -
Thread is marked as Resolved.
-
-
Did you check in Safemove if the defined synch position values are the same as current robot position (synch position) ?
-
Thanks for the info I will check the safe move position and check the synch positions first thing in the morning.
The foundry was shut down over the weekend and for the holiday.
Have a good Labor day and thanks again!