Question about searches, what is the preferred search schedule for welding joints? A lot of ours are currently a 2d shift for a fillet/lap weld at the beginning and end. Then we start the weld with one offset and switch to the other for the end. Wouldn't it be better to do a 2D shift and rotate search/offset for the entire weld that way it makes the planes rather than just offsetting points?